大家應(yīng)該都清楚,模具制造加工時(shí)的原料對(duì)于整個(gè)產(chǎn)品制造工程來(lái)講是起到了一個(gè)非常重要的作用,所以關(guān)于原料的各個(gè)方面的工作都要做好才是,那么有人就想來(lái)了解一個(gè)問(wèn)題--模具原料和制造時(shí)的注塑周期有聯(lián)系嗎?當(dāng)然是有的!下面來(lái)分析下。
We should all know that the raw materials of mold manufacturing and processing play a very important role in the whole product manufacturing engineering, so all aspects of the work of raw materials should be done well. Then someone wants to know a question -- is there a connection between mold raw materials and the injection molding cycle of manufacturing? Of course there is! So let's analyze it.
在加工注塑模具時(shí),要提高節(jié)約原材料的意識(shí),加強(qiáng)原材料的把控,提高每個(gè)員工的工作質(zhì)量和責(zé)任心,全方位減少原材料的浪費(fèi)。注塑生產(chǎn),為企業(yè)創(chuàng)造更多利潤(rùn)。
山東模具制造廠家的注塑周期時(shí)間越短,在保證產(chǎn)品質(zhì)量的前提下越好。注塑周期越短,產(chǎn)量越高,單位產(chǎn)品的制造成本就越低。
In the processing of injection molds, we should improve the consciousness of saving raw materials, strengthen the control of raw materials, improve the work quality and responsibility of each employee, and reduce the waste of raw materials in an all-round way. Injection molding production, for enterprises to create more profits. The shorter the injection cycle time of Shandong mold factory is, the better the product quality is guaranteed. The shorter the injection cycle, the higher the yield, the lower the manufacturing cost per unit of product.
注塑循環(huán)時(shí)間包括注塑時(shí)間、保壓時(shí)間、冷卻時(shí)間、打開(kāi)時(shí)間、頂出時(shí)間、打開(kāi)時(shí)間、回料時(shí)間、合模時(shí)間、合模時(shí)間等,包括注塑臺(tái)前進(jìn)/后退時(shí)間和注塑脫模時(shí)間。在模具注塑廠,縮短注塑周期時(shí)間的主要方法有:減小塑料壁厚/通道尺寸(減少冷卻時(shí)間)、減小開(kāi)合模距離/頂出桿行程、產(chǎn)品快速取出、機(jī)器人操作,提高安全門(mén)開(kāi)/關(guān)速度,減少膠粘現(xiàn)象,正確選擇冷卻時(shí)間,設(shè)置開(kāi)/合模速度等。
The injection cycle time includes injection time, holding time, cooling time, opening time, ejection time, opening time, material return time, mold closing time, mold closing time, etc., including the injection bench forward/backward time and injection demoulding time. In plastic injection mould factory, shorten the molding cycle time of the main methods are: to decrease the size of the plastic wall thickness/channel, reduce the cooling time, reduce the distance/ejection rod stroke, combining a model products, robot quickly after the operation, improve the security door open/close speed, reduce the adhesion phenomenon, correct selection of cooling time, set the opening/closing speed, etc.
縮短注塑周期時(shí)間的一些重要的方法:減小塑件壁厚/流道尺寸、減小開(kāi)合距離/頂針行程、快速取出產(chǎn)品、機(jī)械手操作、加快開(kāi)合速度安全門(mén),減少塑料件的粘連。模具現(xiàn)象,正確選擇冷卻時(shí)間,合理設(shè)置開(kāi)合模速度和頂針?biāo)俣?次數(shù)等。縮短注射周期時(shí)間提高生產(chǎn)率。
Some important methods to shorten the injection cycle time: reduce the wall thickness/runner size of plastic parts, reduce the opening and closing distance/thimble stroke, quickly take out the product, manipulator operation, speed up the opening and closing speed safety door, reduce the adhesion of plastic parts. Mold phenomenon, correct selection of cooling time, reasonable setting of mold opening and closing speed and thimble speed/times. Shorten injection cycle time to improve productivity.
模具原料和制造時(shí)的注塑周期有聯(lián)系嗎?關(guān)于這個(gè)問(wèn)題您看完上述講解應(yīng)該已經(jīng)有了解了,所以在進(jìn)行模具的加工制造時(shí)應(yīng)該要好好的做一些準(zhǔn)備措施才行。更多內(nèi)容的了解,您可以來(lái)我們網(wǎng)站
m.samsungstarex.com.cn咨詢,客服人員二十四小時(shí)等待您!
Is there a connection between the mold material and the injection cycle at the time of manufacture? You should have an understanding of this problem after reading the above explanation, so in the processing and manufacturing of the mold should be good to do some preparatory measures. For more information, you can come to our website m.samsungstarex.com.cn for consultation, customer service staff waiting for you 24 hours!