在注塑模具廠家在驗(yàn)收模具的時(shí)候,要注意一些常見的問題,這里小編來詳細(xì)介紹下。
In the acceptance of injection mold manufacturers, we should pay attention to some common problems. Here is a detailed introduction.
由于驗(yàn)收模具過程中總是伴隨著某些風(fēng)險(xiǎn),任何可以想象得到的、都可能發(fā)生的情況我們事前都要進(jìn)行風(fēng)險(xiǎn)評估。重點(diǎn)應(yīng)該關(guān)注模具的復(fù)雜程度、備件的關(guān)鍵特性、配件的后處理質(zhì)量、以及在移動(dòng)模具過程中任何可預(yù)見的突發(fā)性風(fēng)險(xiǎn)。
As there are always some risks in the process of mold acceptance, we must conduct a risk assessment in advance for any conceivable and possible situation. The focus should be on the complexity of the mold, the key characteristics of spare parts, the aftertreatment quality of accessories, and any foreseeable sudden risks in the process of moving the mold.
若評估發(fā)現(xiàn)后得出了較高的風(fēng)險(xiǎn)系數(shù),則收貨前越需要做詳細(xì)的搬運(yùn)前準(zhǔn)備工作。收到貨后應(yīng)該盡量避免發(fā)生模具損壞,導(dǎo)致停工停產(chǎn),對注塑生產(chǎn)業(yè)務(wù)經(jīng)營造成負(fù)面影響等情況。
If a higher risk coefficient is obtained after the evaluation, the more detailed preparations need to be made before receiving the goods. After receiving the goods, we should try our best to avoid mold damage, resulting in downtime, which will have a negative impact on the operation of injection molding production business.
濟(jì)南注塑加工廠家認(rèn)為應(yīng)該觀察一套模具加工的運(yùn)轉(zhuǎn)情況,包括檢查模腔的狀況、循環(huán)時(shí)間、制模工藝條件,不可思議的四點(diǎn)就是進(jìn)行價(jià)值評估。
Jinan injection molding manufacturers believe that they should observe the operation of a set of mold processing, including checking the condition of the mold cavity, cycle time, and molding process conditions. The incredible four points are value evaluation.
如果模具正處于不是正處于運(yùn)轉(zhuǎn)當(dāng)中,尤其模具已經(jīng)長時(shí)間停用的情況下,在模具準(zhǔn)備移送之前,需先進(jìn)行試加工,評估該套模具的使用價(jià)值。
If the mold is in operation or not, especially when the mold has been out of service for a long time, it is necessary to carry out trial processing before the mold is ready for transfer to evaluate the use value of the set of molds.
對保留下來的試樣件盡可能了解到部分信息,但更多的詳細(xì)情況就不可能知道了??赡軟]有了解到實(shí)際生產(chǎn)時(shí)的工藝條件,或者不知道經(jīng)過修正的工藝參數(shù)。循環(huán)時(shí)間不能通過推斷來判定,特殊的輔助設(shè)備儀器可能沒有被提醒注意。
Try to know some information about the retained samples, but it is impossible to know more details. You may not know the actual production process conditions, or you may not know the corrected process parameters. The cycle time cannot be determined by inference, and special auxiliary equipment and instruments may not be reminded.
如果模具在加工某個(gè)部件只是應(yīng)用了這套模具中的部分型腔,而不是模具在滿型腔注射的運(yùn)轉(zhuǎn)狀態(tài)的話,那么發(fā)給客戶看的各個(gè)數(shù)據(jù)的加工參數(shù)就理所當(dāng)然地值得懷疑。
If the mold only applies part of the cavity in the mold when processing a certain part, rather than the operation state of the mold injected in the full cavity, then the processing parameters of various data sent to the customer for viewing are naturally questionable.
在賣家交送模具之前,在注射機(jī)上滿型腔注射狀態(tài)下進(jìn)行試運(yùn)轉(zhuǎn),以便于檢測模具的各個(gè)產(chǎn)品質(zhì)量。更多相關(guān)內(nèi)容就來我們網(wǎng)站
http://m.samsungstarex.com.cn看看吧。
Before the seller delivers the mold, the test run shall be carried out under the full mold cavity injection state on the injection machine, so as to test the quality of each product of the mold. Come to our website for more relevant content http://m.samsungstarex.com.cn Take a look.